Overview of Extended MRP Data—Introductory Exercises
| IMPORTANT ! |
| It is extremely important
that you set up and work within your own site(s) to maintain your
data integrity. If you work within any other sites, you will
compromise your own exercise data as well as the data of other
students. Predictable exercise results require that your data
be isolated in your own site(s). |
Basic Data Setup
Inventory Parts with Different Planning Methods and Configuration
Characteristics
Purpose: The purpose of this exercise is to set
up the inventory parts required for running extended exercise for Material Requirements Planning.
Windows:
Copy Parts To Site
Background Jobs
Inventory Part
Note: If you already have these parts copied to your
primary site, please set the planning attributes, Planning Method and Supply Type in the
Planning Data tab and lead time in the
Acquisition
tab according to the table below.
- Open the
Copy Parts To Site window.
- In the From area, enter 1 in the Site field.
- Enter 920 in the Comm. Group 2 field.
- In the To area, enter your primary site in the Site field.
- Click OK.
- Open the
Background Jobs window and populate it. Make sure
the background job is complete. When it finishes, the parts
listed in the table below will be copied to your primary site.
- Open the
Inventory Part window and query for your primary site and for part numbers that match
90-%. Set the planning methods and other planning
data values as shown in the last three columns of the table below.
| Part No |
Description |
Part Type |
Planner |
U/M |
Lead Time |
Planning Method |
Planning |
Supply Type |
| 90-200 |
Dual 200 watts bass system |
Manufactured |
* |
pcs |
0 |
A |
|
Requisition |
| 90-210 |
10" 4 ohm 200 watts woofer |
Manufactured |
* |
pcs |
0 |
B |
Order Point Qty = 10 |
Requisition |
| 90-220 |
Low frequency crossover |
Manufactured |
* |
pcs |
1 |
D |
Multiple Lot Size= 5 |
Requisition |
| 90-230 |
Fused Distribution Block |
Manufactured |
* |
pcs |
1 |
E |
Ordering Cost=100
Interest Cost=3%
Estimated Material Cost=200 |
Requisition |
| 90-240 |
Wiring Harness |
Manufactured |
* |
pcs |
1 |
F |
Ordering Cost=100
Interest Cost=0.5%
Estimated Material Cost=200 |
Requisition |
| 90-250 |
2 channel 200 watts amplifier |
Manufactured |
* |
pcs |
1 |
G |
Order Cover Time=5 |
Requisition |
| 90-260 |
Platinum Fuse Box |
Manufactured |
* |
pcs |
1 |
K |
|
Requisition |
| 90-270 |
Mounting Kits |
Manufactured |
* |
pcs |
1 |
M |
|
Requisition |
| 90-280 |
Cooling Fan |
Manufactured |
* |
pcs |
1 |
P |
|
Requisition |
| 90-211 |
Woofer Component |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-221 |
Crossover Component |
Purchased |
* |
pcs |
0 |
A |
Min Lot Size=4 |
Requisition |
| 90-231 |
Distribution Block Component |
Purchased |
* |
pcs |
0 |
A |
Max Lot Size=10 |
Requisition |
| 90-241 |
Wiring Harness Component |
Purchased |
* |
pcs |
0 |
A |
Scrap Factor=10% |
Requisition |
| 90-251 |
Power Circuit |
Manufactured |
* |
pcs |
0 |
A |
Manufactured / Acquired
Split = Yes
Manufacture %=50%
Acquire %=50% |
Schedule |
| 90-252 |
Power Supply |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-253 |
Circuit Board |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-254 |
Chips |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-261 |
Fuse Box Component |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-271 |
Screw |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-272 |
Hatchback style housing |
Manufactured |
* |
pcs |
0 |
N |
|
Requisition |
| 90-273 |
L shape aluminum plate |
Purchased |
* |
pcs |
0 |
C |
Order Point Qty=8 |
Requisition |
| 90-274 |
Box Hatchback adapter |
Manufactured |
* |
pcs |
0 |
N |
|
Requisition |
| 90-281 |
Cooling Fan Component |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-300 |
6.5" Component System |
Manufactured |
* |
pcs |
0 |
A |
|
DOP |
| 90-301 |
6.5" Woofer |
Manufactured |
* |
pcs |
0 |
A |
|
DOP |
| 90-302 |
1" Tweeter |
Manufactured |
* |
pcs |
0 |
A |
|
Requisition |
| 90-303 |
2-way Crossover |
Manufactured |
* |
pcs |
0 |
A |
|
DOP |
| 90-304 |
Speaker Rubber |
Purchased |
* |
pcs |
1 |
A |
|
Requisition |
| 90-305 |
Aluminum Injected Plastic |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-306 |
Graphite Injected Plastic |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-307 |
Multi Mount Tweeter Cover |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-308 |
Capacitor |
Purchased |
* |
pcs |
0 |
A |
|
Requisition |
| 90-309 |
Circuit Board |
Purchased |
* |
pcs |
0 |
A |
|
Schedule |
Copy Multi-site Inventory Parts
Purpose: The purpose of this exercise is to
copy a part to your secondary site for use in multi-site scenarios required for running extended exercise for
MRP. Skip this section if you are only doing PMRP
exercises.
Windows:
Inventory Part
- Copy part number 90-211 to your secondary
site. Query for part 90-211, right-click and then click Duplicate.
- Change the value of the Site to your
secondary site, then save your new record.
- Check the attributes on the Planning tab to be sure
they match those described in the table below. Save any changes if
necessary.
| Part No |
Description |
Part Type |
Planner |
U/M |
Lead Time |
Planning Method |
Planning |
Supply Type |
| 90-211 |
Woofer Component |
Manufactured |
* |
pcs |
0 |
A |
|
Requisition |
Planning Network
Purpose: The purpose of this exercise is to set
up a planning network required for running extended exercise for MRP. Skip this section if you are only doing PMRP exercises.
Windows:
Planning Network
- If you haven't already done so, create a new
planning network with a unique ID and description. Hint: Use your
initials or name to identify the planning network.
- Add your primary and secondary sites to the network
in the table below.
General
exercise for Planning Network
Production Line
Purpose: The purpose of this exercise is to set
up the production line required for running extended exercise for MRP. Skip this section if you are only doing PMRP exercises.
Windows:
Production Line
- If you haven't already done so, create a new production line 001 in your
primary site and
attach the 90-251 part to this production line.
General
exercise for Production Line
Configuration Characteristic
Purpose: The purpose of this exercise is to set
up the configurations required for running extended exercise for MRP.
Skip this section if you are only doing PMRP.
Windows:
Configuration Characteristic
Configuration Family
Part
- In the
Configuration Characteristic window, query for characteristic IDs
WF-1and TW-1. Both characteristic should have attributes as described in the
table below.
| Characteristic ID |
Description |
CBS Scheduled |
Data Type |
Config Value Type |
Mandatory |
| WF-1 |
Magnet |
Not |
Numeric |
Discrete Option |
Yes |
| TW-1 |
Shape |
Not |
Alpha |
Discrete Option |
Yes |
| Characteristic ID |
Option Value ID |
Option Description |
| WF-1 |
1 |
Single Magnet |
| WF-1 |
2 |
Dual Magnet |
| TW-1 |
01 |
Dome |
| TW-1 |
02 |
Semi-Dome |
General
exercise for Configuration Characteristic
- In the
Configuration Family window query for family WF-C and TW-C. Each
family should have one characteristic ID as described in the table below.
| Config Family ID |
Description |
Characteristic ID |
| WF-C |
Woofer Configuration |
WF-1 |
| TW-C |
Tweeter Configuration |
TW-1 |
General
exercise for Configuration Family
- Set the 90-300, 90-301 and 90-302 parts to configurable parts. Attach
the configuration family as described in the table below.
| Part No |
Config Family ID |
Copy All Characteristics in Family |
| 90-301 |
WF-C |
Yes |
| 90-302 |
TW-C |
Yes |
General
exercise for Part Catalog
Structures
Purpose: The purpose of this exercise is to set
up the product and configuration structures required for running extended exercise for MRP.
Windows:
Product Structure
Configuration Structure
- Copy the product structure for your parts from site 1 into your primary site, as described in the table
below. Promote all the structures to the Buildable state.
- For PMRP exercises, use these same structures and make sure Std
Planned Item check box is cleared on each component line.
| Parent Part |
Component Part |
Qty per Assembly |
| 90-200 |
90-100 |
1 |
| 90-200 |
90-210 |
2 |
| 90-200 |
90-220 |
2 |
| 90-200 |
90-230 |
1 |
| 90-200 |
90-240 |
2 |
| 90-200 |
90-250 |
2 |
| 90-200 |
90-260 |
2 |
| 90-200 |
90-270 |
1 |
| 90-200 |
90-280 |
1 |
| 90-210 |
90-211 |
1 |
| 90-220 |
90-221 |
1 |
| 90-230 |
90-231 |
1 |
| 90-240 |
90-241 |
1 |
| 90-250 |
90-251 |
1 |
| 90-250 |
90-252 |
1 |
| 90-251 |
90-253 |
1 |
| 90-251 |
90-254 |
4 |
| 90-260 |
90-261 |
1 |
| 90-270 |
90-271 |
10 |
| 90-270 |
90-272 |
2 |
| 90-272 |
90-273 |
1 |
| 90-272 |
90-274 |
2 |
| 90-274 |
90-112 |
1 |
| 90-280 |
90-281 |
1 |
| 90-303 |
90-308 |
2 |
| 90-303 |
90-309 |
1 |
General
exercise for
Product Structures
- Copy configuration structures for the 90-300, 90-301,
and 90-302 configured parts from site 1 into your primary site, as described in the table below. Promote
all the structures to Buildable state. Skip this
section if you are only doing PMRP exercises.
| Parent Part |
Component Part |
Qty per Assembly |
| 90-300 |
90-301 |
1 |
| 90-300 |
90-302 |
1 |
| 90-300 |
90-303 |
1 |
| 90-301 |
90-304 |
1 |
| 90-301 |
90-305 |
1 |
| 90-302 |
90-306 |
1 |
| 90-302 |
90-307 |
1 |
Internal Supplier
Purpose: The purpose of this exercise is to set
up an internal supplier in Purchasing required for running extended exercise for
MRP. Skip this section if you are only doing PMRP
exercises.
Windows:
Supplier
- If you haven't already done so, create an internal
supplier associated with your secondary site. Follow the general
exercise for suppliers to do this.
- On the
Purchase/Misc Supplier Info
tab, be sure to click the Internal Supplier checkbox and specify your
secondary site as the Supplier Site.
General
exercise for Suppliers
Multi-site Planned Supplier for Purchase Part
Purpose: The purpose of this exercise is to
associate a multi-site purchased part with an internal supplier for use in
exploring multi-site MRP planning functionality required for running extended exercise for
MRP. Skip this section if you are only doing PMRP
exercises.
Windows:
Supplier for Purchase Part
- Create a Supplier per Purchase Part record for part
90-211 on your primary site using the new internal supplier.
- Define a price of $10 USD.
- Make certain you click the Multi-Site Planned
check box for this supplier/part combination to indicate multi-site
distribution features should be enabled for this item.
Internal Customer
Purpose: The purpose of this exercise is to set
up an internal customer in Customer Order required for running extended exercise for
MRP. This Customer is required as part of the Distribution Order features. Skip this section if you are only doing PMRP exercises.
Windows:
Customer
- If you haven't already done so, create an internal
customer associated with your primary site. Follow the general
exercise for customers to do this.
- On the Customer/Order/Misc Customer Info
tab, be sure to click the Internal Customer checkbox and specify your
primary site as the Customer Site.
- Also on the Customer/Order/Misc Customer Info
tab, specify an Order Type to be used as a default. This is needed
when creating Distribution Orders.
General
exercise for Customers
Sales Part
Purpose: The purpose of this exercise is to
associate the multi-site part with a sales part for use in
exploring multi-site MRP planning functionality required for running extended exercise for
MRP. This sales part record is necessary to utilize the Distribution Order
features. Skip this section if you are only doing PMRP
exercises.
Windows:
Sales Part
- Create a Sales Part record for part
90-211 on your secondary site.
- Define a price of $10 USD.
General
exercise for Sales Part
Supply and Demand
Purpose: The purpose of this exercise is to manually
create supply and demand for parent part in the structure so you can study how that demand
is driving component parts with different planning methods and configuration
characteristics.
Windows:
Sales Part
Customer Order
Material Requisition
Receive Inventory Part
Inventory Part In Stock
Project
- Open the
Sales Part window and define the 90-200 and 90-300
parts as sales
parts with a price of $100 USD each in your primary site.
General exercise for Sales Part
Skip steps 2-5 if you are only doing PMRP
exercises.
- Open the
Customer Order window and create a customer order
with a delivery date that is 1 month ` of today's date in your primary site. You can use existing
customer or create a new customer to be used in this exercise.
- Create a customer order line for the 90-200 sales part with a sales quantity of 3.
Save the record.
General exercise for Customer Order
- Open the
Material Requisition window and create a new order
for the 90-230, 90-240, and 90-250 parts, as described in the
table below. You can use existing internal customer or create a new internal
customer to be used in this exercise.
General
exercise for Material Requisition
| Part No |
Qty Due |
Due Date |
| 90-230 |
100 |
1 month ahead of today's date |
| 90-230 |
100 |
2 months ahead of today's date |
| 90-230 |
100 |
3 months ahead of today's date |
| 90-240 |
100 |
1 month ahead of today's date |
| 90-240 |
100 |
2 months ahead of today's date |
| 90-240 |
100 |
3 months ahead of today's date |
| 90-250 |
50 |
3 days ahead of customer order date created in point no.2 above |
| 90-250 |
5 |
1 month ahead of customer order date created in point no.2 above |
- Open the
Receive Inventory Part window. In your primary
site, query for part 90-280 and receive 1
piece of it to location 1 with inventory value 200.
Note: You may need to duplicate inventory location 1
from Site 1 to your primary site first if you do not have it defined.
General
exercise for Receive Inventory
Skip steps 6-13 if you are only doing MRP
exercises.
- Open the
Customer Order window and create a customer order with
a delivery date that is 1
month ahead of today's date in your site. You can use an existing
customer or create a new customer to be used in this exercise.
- Create a customer order line for the 90-200 sales part with a sales quantity of 3.
Enter XX100 in the Project ID column, and XXA100 in the Activity
ID column (XX refers to your initials). Save the record.
- Open the
Project window.
Query for your project XX100. Click on the Demand tab/Misc Parts tab. Click the
New record button to create a new record. From the list of values,
select the XXSP100 sub project and XXA100 activity id. Enter your site in
the Site column.
- In the Part Number column, enter 90-230. In
the Required Quantity column, enter 100. In the Required Date
column, enter a date 1 month ahead of today's date. Set the Supply
Option to Project MRP and Std Planned Item check
box must be
cleared. Repeat this step for
the same part and required quantity, but with a required date 2 months ahead
of today's date and 3 months ahead of today's date, i.e. three records
in all.
- Repeat steps 8 and 9 for part 90-240.
- For part 90-250, create two records. For the same
sub project XXSP100 and activity id XXA100, one for a required quantity of
50 three days ahead of customer order date created in step no 6. Another
one for a required quantity of 5 half month ahead of customer order date created in
step no 6.
- Open the
Receive Inventory Part
window. In your site, query for part 90-280 and receive 1 piece of it to
location 1 with inventory value 200. Note: You may need to duplicate
inventory location 1 from Site 1 to your site first if you do not have it
defined.
- Open the Inventory Part In Stock.
Query for part 90-280 at your site and highlight the record. Right click,
then click Transfer to Project Inventory. In the
Transfer to
Project Inventory dialog, Enter XX100 in the Project ID field,
XXSP100 in the Sub Project ID field and XXA100 in the Activity ID field (XX
refers to your initials). Click OK.
Copy Inventory Parts for Alternate Components
Purpose: The purpose of this exercise is to
copy parts to your site for use in alternate component scenarios required for running extended exercise for MRP.
It is recommended that you create a site separate from the one used for the
previous exercises for multi-site MRP or MRP for Configured Parts. Skip this
section if you are only doing PMRP
exercises.
Windows:
Site
Inventory Locations
Inventory Part
Alternate Component
Product Structure
Receive Inventory Part
- Create a separate site for this Alternate Components in MRP exercise.
- In the
Inventory Locations window, create a new inventory
location for your site, with Location Group as PICK. Save the record.
- Copy part number 90-111 to your site. Query for part 90-111,
right-click and then click Copy Part. Change the value of the
To Site field to your
site. Keep the value of the To Part field as 90-111. In the table
window, uncheck the Part Catalog, General checkbox. Click OK.
- Query for part 90-111 and your site. Right-click, then
click Copy
Part. Change the value of the To Site to your
site. Change the value of the To Part to 90-111A1, and
enter a description for this part. In the table window, check the Part
Catalog General
checkbox. Then click OK.
- Make another copy of the 90-111 part, this time with To Part
field set
to 90-111A2, and To Site field set to your site. The
checkboxes in the table area must be set to the same as in step 4.
- Check the Zero Cost attribute in the Cost Control area on the Misc
Part Info tab to be sure
it is set to Zero Cost Allowed. Save any changes if
necessary.
- In the
Alternate Component window in Manufacturing Standards, query for part
90-111 at your site. Create a new record in the table window. Enter 10 in
the Substitution Sequence column, 90-111A1 in the Alternate Part column, and
select Include During MRP in the MRP Netting Use column. This insures that the MRP
process considers existing supply of this part before generating requisitions for the
primary part. Save the record. Repeat this, creating another alternate part
90-111A2 for 90-111, using substitution sequence 20, other column values
being the same.
- Query for part 90-112 and site 1. Right-click, then
click Copy
Part. Change the value of the To Site field to your site. In the table window,
uncheck the Part
Catalog General, Add From Part as an Alternative Component to the To Part,
as well as the Add To Part as an Alternative Component to the From Part
checkboxes. Then click OK.
- Query for part 90-110 and site 1. Right-click, then
click Copy
Part. Change the value of the To Site field to your site. In the table window,
uncheck the Part
Catalog General, Add From Part as an Alternative Component to the To Part,
Add To Part as an Alternative Component to the From Part, and all four of
the Manufacturing Routings
checkboxes. Then click OK.
- In the
Product Structure window in Manufacturing Standards, query for
part 90-110 at your site. In the
Product Structure tab, right click, select
Build to make the structure Buildable.
- In the
Receive Inventory Part window, query for part 90-111A1 at your
site. In the table window, receive a quantity of 10 of this part at the
location you defined in step 2. In the Define Cost Structure dialog, enter
110 in the Cost Bucket ID column, and 0 in the Cost/Unit column. Click OK.
Similarly, receive a quantity of 10 of part 90-111A2 at your site.