Report Planned Cost
Explanation
Use this activity to report the planned cost of a sub contract revision to 
the connected project 
activity. The planned cost will be reported automatically when a revision 
is activated. Select the Report Planned Cost check box if you need to 
report planned cost before activating the revision.
Only one active revision of the contract can report planned cost at any given 
time. The cost elements on which the cost is reported to 
the connected project activities will be derived depending on the posting 
control setup. The default activity will be used to report cost of all 
the items that have not been connected to a project activity.
Prerequisites
	- The sub contract should be connected to at least one project activity.
 
	- An active revision should exist or the Report Planned Cost 
	check box should be manually selected for the non-active revision.
 
	- Posting control setup should be defined so that the correct cost 
	elements will be updated.
 
System Effects
Planned cost of the contract revision will be 
reported to the project cost activities connected to the revision.
Window
Sub 
Contract
Related Window Descriptions
Sub Contract/Revision
Sub Contract/Lines/Items/Items
Procedure
	- Open the Sub Contract window and query for the required sub contract 
or select from the list of values.
 
	- Click the Items tab and 
	select the required contract revision.
 
	- Select the Report Planned Cost check box. Note: This check 
	box can be selected for contract revisions that have not been activated yet.
 
	- If changes are made to project cost elements, or discounts and 
	deductions on sub contract, select the revision line on the 
	Revision tab, right-click and then select the
	Update Planned 
Cost menu option. 
 
	- The Report Planned Cost check box is automatically 
	selected, when activating a non-active revision.