Update Connected PM Actions
Explanation
This activity is used to update standard jobs on PM actions when the standard job 
is changed. To do so right-click on the relevant standard job in the 
Standard Jobs,
Separate Standard Job or 
Route Standard Job
windows and click Update Connected PM Actions. The right-mouse-button options will
only be available for revision control disabled active standard job revisions.
It is possible to view a summary of the registered
separate and route PM actions that have connections to updated
standard jobs from PM Actions for Standard Jobs window. 
Prerequisites
  - A connection between the standard job
    revision and the PM action must exist.
 
	- Revision control should be disabled on the updated standard job.
 
  - An active revision must exist in the system.
 
  - The connected PM action must be in the Preliminary
    or Active status. 
 
System Effects
	- If the updated standard job revision is connected to a PM action which 
	is in Preliminary status, this PM action will be updated with the active standard job 
	revision.
 
	- If the updated standard job revision is connected to a PM action which 
	is in Active status, a new revision of the PM action will be created 
	with the active standard job revision. This is done automatically unless 
	there are exceptions, e.g., the revision number of the PM action is a 
	non-numeric value or preliminary PM actions exist. For such PM actions you 
	need to manually create a new revision of the PM action and make the 
	connection to the active standard job. 
 
Window
Separate
Standard Job 
Route Standard Job
Related Window Descriptions
Separate
Standard Job 
Route Standard Job 
Procedure
  - Open either the 
	Separate Standard Job 
	or Route Standard Job windows and query for an active revision
    (F3).
 
  - Right-click and then click Update Connected PM Actions (This option will be available only when an 
	Revision control is disabled on standard job).