Replace Obsolete Standard Job Revisions 
Explanation
This activity is used to replace obsolete standard job revisions
that are connected to PM actions. You 
can either replace the revisions individually or process it in batches.
It is possible to view a summary of the registered
separate and route PM actions and work orders that have connections to obsolete
standard jobs. To do so right-click on the relevant standard job in the 
Standard Jobs,
Separate Standard Jobs or 
Route Standard Jobs
windows and click Obsolete Revisions on PM Actions or Obsolete
Revisions on Active Work Orders. The right-mouse-button options will
only be available for active standard job revisions.
Prerequisites
  - A connection between the obsolete standard job
    revision and the PM action must exist.
 
  - An active revision of the obsolete standard job revision
    must exist in the system.
 
  - The connected PM action must be in the Preliminary
    or Active status. 
 
System Effects
	- If the obsolete standard job revision is connected to a PM action in Preliminary status, this PM Action will be updated with the active standard job revision
 
	- If the obsolete standard job revision is connected to a PM action in Active status, a new revision of the PM Action will be created with the active standard job revision. This is done automatically unless there are exceptions, e.g., the revision number of the PM action is a non-numeric value or preliminary PM Action exist. For such PM actions you need to manually create a new revision of the PM action and make  the connection to the active standard job. The background job for replacing obsolete standard job revisions will be updated with information on the exceptions that need to be handled manually.
 
Window
Separate
Standard Job 
Route Standard Job
Related Window Descriptions
Separate
Standard Job 
Route Standard Job 
Procedure
  - Open either the 
	Separate Standard Job
    or Route Standard Job windows and query for an active revision
    (F3).
 
  - Right-click and then click Replace Obsolete Revisions
    on PM Actions. (This option will be available only when an obsolete connection
    exists.)
 
To replace the revisions in batches:
	- Open the 
	Replace Obsolete Standard Jobs on 
	PM Actions dialog box. Change the value in the Site field if 
	required and click OK. Alternatively you can click Default 
	display the default values defined by your administrator in 
	Database Tasks.
 
	- Optionally click Schedule and follow the 
	steps in the wizard that appears if you wish to schedule the task as a 
	background job run automatically at predefined intervals.