Use this window to enter and revise data for work centers. The information that you enter for work centers is used when you work with operations, shop orders, master scheduling, material requirements planning (MRP), and cost estimates. Work centers are used when you enter operations, so they must be entered before operations.
A Work Center can be in one of the following states.
Active - The work center is used by manufacturing. Capacity must be measured in hours.
Inactive - The work center is no longer in use and is not available in 
the list of values. 
Planned - The work center is used by resource planning. Capacity can be in any unit of measure.
Note: If IFS/Purchasing is not installed, then you cannot create outside work centers.
For a description of each tab in the window, follow the appropriate link: Detail, Cost, Resource, WC Capacity, Routings, Routing Templates, Std Operations, RRP Capacity, Location, Utilization Statistics, Setup Matrix, Emissions
BDR for Structure/Routing
BDR for RRP
BDR for constraint based
scheduling
BDR for production 
schedules
BDR for shop 
floor reporting
Set up object 
costing
basic data
BDR for 
eco-footprint impact estimation
Create
work center
Define resources
Calculate work center resource capacity for manufacturing
Define RRP unique work
centers
Define RRP resources
Create a routing template
Define work center cost
Copy work center from other 
work
center
Create setup
matrix
Enter shop floor 
reporting basic data
Define work center 
emissions