Cumulative Lead Time Calculation
Usage
Use this dialog box to calculate the cumulative 
lead time of a specific part or all parts in a site.
	- When calculating the cumulative lead time for a 
	single part, it looks just one level down and accumulates the lead time to 
	the top. 
	It does not consider the entire BOM structure.
- When calculating the cumulative lead time for all parts in a site, it 
	starts with calculating low level code, then it calculates the cumulative lead 
	time for the parts on the lowest level and then it continues with parts on 
	(lowest level - 1) etc. This always gives accurate results.
Specify whether you want to perform a calculation for all parts in a site or for one part at a time. In either case, the lead time 
calculation only uses the default '*' alternate. Only alternates in the Planned 
or Buildable states are used.
Activity Diagrams
Manage 
routings
Activities
Calculate
cumulative lead time