Replace Planning Structure Component
Explanation
Use this activity to replace a component in a selected planning structure.
Prerequisites
This activity requires that all components must be defined in 
Inventory Part. The structures of the parts must have been entered. 
System Effects
As a result of this activity, the system replaces a component in a selected structure.
Window
Planning Structure
Related Window Descriptions
 Planning Structure
Procedure
  - Display the parent part by clicking Populate (F2) or by making a selective
    query (F3).
- Click the component you want to replace in the 
	Planning Structure tab,
    right-click, then click Replace Component.
- In the  Part No  field in the Component In  group box,
    select the component to phase in. Click List of Values (F8) to select from available
    parts.
- Enter the quantity of the component to constitute one parent
    part in the  Qty per Assembly  field in the Component In  group box.
- Click OK.