Perform a Detailed Revision Transfer for a Site
Explanation
Use this activity to start a detailed transfer of an engineering revision to a site.
You can select whether you want to do a single level transfer or transfer all levels of
the part. Only one engineering revision can be transferred at a time. 
Prerequisites
This activity has the following prerequisites: 
  - The destination site must exist in the system
- The engineering revision must exist.
System Effects
As a result of this activity:
  - The system starts a detailed transfer of an engineering
revision to a site.
- If you start the detailed transfer function in the  
	Engineering
Revision Transfers window, the engineering revision is moved from 
	the Engineering
Revision Transfers window to the 
	Engineering Revision Transfer Actions window.
- The Action state in the 
	Engineering Revision Transfer Actions window is set to In Process for the part.
- Depending on the part transfer template 
  used for the transfer, alternate components defined in engineering are also 
  transferred over, and may overwrite existing alternate component definitions 
  in manufacturing. 
Window
Engineering Revision Transfers
Engineering
Revision Transfer Actions
Related Window Descriptions
Engineering Revision Transfers
Engineering Revision Transfer Actions
Procedure
Engineering Revision Transfers : 
  - Open the  Engineering Revision Transfers window.
- Select the destination site in the    Current Site  field.
    Click List of Values  to select from available sites.
- Populate or query  to retrieve the part records.
- Select the engineering revision for which you want to start a detailed
    transfer.
- Right-click and then click Detailed Transfer. The 
	Transfer 
	Parameter dialog box will be opened.
- Select either  Single Level Transfer  or  All Level Transfer, depending on
    the levels you want to transfer.
 
- Select Include parts where part type has been changed check box for the system to identify  the 
	transferable parts 
    during the next transfer, if there is a difference between the values in Part Type  and  Current Inventory Part Type fields in 
    Engineering Revision Transfer Actions
    window. This is similar in changing the PDM preliminary rev change from Not Changed to Changed.
- Select Include Proposed Start and/or End Date(s) check box to include the proposed start date and/or end date specified in the selected engineering revision(s) during a
    single level or all level transfer to its component parts. If the proposed start date is not defined, the current system date will be considered for the transfer.
- Select the Create Prototype Structure check box ,If you want to create the prototype structures via an engineering transfer
- Click OK.
Engineering Revision Transfer Actions: 
  - Open the Engineering Revision Transfer Actions
    window.
- Populate or query  to retrieve the part records
- Right-click and then click Detailed Transfer. The 
	Transfer 
	Parameter dialog box will be opened.
- Select either  Single Level Transfer  or  All Level Transfer, depending on
    the levels you want to transfer.
 
- Select Include parts where part type has been changed check box for the system to identify  the 
	transferable parts 
    during the next transfer, if there is a difference between the values in Part Type  and  Current Inventory Part Type fields in 
    Engineering Revision Transfer Actions
    window. This is similar in changing the PDM preliminary rev change from Not Changed to Changed.
- Select Include Proposed Start and/or End Date(s) check box to include the proposed start date and/or end date specified in the selected engineering revision(s) during a
    single level or all level transfer to its component parts. If the proposed start date is not defined, the current system date will be considered for the transfer.
- Select the Create Prototype Structure check box ,If you want to create the prototype structures via an engineering transfer
- Click OK.