Update Planned Cost from Supplier Price
Explanation
This activity is used to enable the update of the engineering register 
material procurement list (ERMPL) planned costs based 
on supplier price. The latest price changes from the supplier can always be 
updated on the ERMPL, by this activity.
Prerequisites
	- At least one part must be registered on the ERMPL  
	tab.
 
	- The part should at least have one supplier defined price. 
 
System Effects
	- The planned cost of the ERMPL demand will be updated based on the latest 
	of the primary 
	supplier price.
 
	- The Design Obj. CE Updated  check box  on 
	this window/tab  will be cleared, if previously selected.
 
Window
ERMPL
Related Window Descriptions
ERMPL
Procedure
	- Open the  
	Project 
	Navigator or the  Project window, and 
	search for the project for which the cost should be updated. Alternatively 
	on the Activity window, search for the required activity. Click on the 
	Demand/ERMPL 
	tab. 
	Alternatively, simply open the ERMPL window. 
 
	- Select a demand line, right-click, point to Update Planned 
	Cost and then click Update from Supplier Price. Observe that the 
	cost elements and total planned cost are updated with the latest supplier 
	price. Further, the Design Obj. CE Updated check box on 
	this window/tab will be cleared, if it was previously selected indicating that the 
	planned cost for the design object has not been synchronized 
	with the latest ERMPL cost details that appeared after the update. Perform the Update Design Object Planned Cost 
	from ERMPL activity to do so.